Tier 3 data processing centre: 600 m², 2×1600 kVA substation, 2 MVA UPS, 176 cabinets — lead design consultant.

Project description

Scope and solutions

“Construction of a Data Processing Centre” — extension of Bank BPH's data processing centre in Kraków for Asseco Poland S.A. (08.2012–01.2013): Tier 3 standard, 600 m² of server space with support areas, two MV service connections, 2×1600 kVA containerised substation, 1.4 MVA and 1.8 MVA generator sets, 2 MVA of UPS capacity (total for both chains), active power 1.2 MVA, 1,086 kW cooling, 176 server cabinets. Eko Elprom as lead design consultant: electrical, automation with utilities monitoring, telecommunications, ELV (IT, TEL, FAS, fixed fire suppression, VESDA, I&HAS, CCTV, access control, SMS), architecture, structural engineering, plumbing & HVAC, building permit, cost estimates. References from Asseco Poland and a letter of thanks from Bank BPH (Director of the IT Resources Management Department).

Contact

Planning a similar project?

Describe the building and the project stage — we will reply with a quote and a schedule within one working day.

Quick enquiry

Quote within one working day. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland

    ELV department

    Telecommunications design

    HVAC automation & BMS