Airports
Conversion of the Cargo Terminal into a Passenger Terminal, Kraków Airport
Change of use of the cargo terminal to a passenger terminal — electrical and ELV installations, coordinated with the operational airport.

Project description
Scope and solutions
Conversion of the former Kraków Airport cargo terminal into a temporary passenger terminal — a waiting area with six gates for non-Schengen flights, relieving the main terminal during its extension. Electrical and ELV scope: power supply and distribution, general and emergency lighting, ELV systems (FAS, VAS, CCTV, access control, LAN) and supply to passenger handling systems. Designed in cooperation with WLC Inżynierowie; works contractor — Mostostal Warszawa.
Other projects

Extension of the Wrocław-Strachowice passenger terminal — electrical and ELV systems, design in progress.

VIP terminal at CPK Airport in Baranów (approx. 2,600 m²) — electrical and ELV design of the building (in progress).

New Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland