Healthcare
Operating Theatres, Narutowicz Hospital, Kraków
Reconstruction of operating theatres — combined building permit and detailed design of electrical and ELV installations (IT systems).

Project description
Scope and solutions
Reconstruction of the operating theatres of the G. Narutowicz Municipal Specialist Hospital in Kraków. Combined building permit and detailed design of internal electrical installations (including IT (isolated) systems for operating theatres) and ELV installations.
Other projects

12,273 m² clinic (general contractor Erbud): 2×1250 kVA substation, 630 kVA generator set, 160 kVA UPS, networks, site lighting, I&C and BMS — detailed design and revised building permit design.

Hospital HEMS helipad — building permit and detailed design of electrical and ELV installations (navigation lighting).

Hospital extension with an emergency department building — building permit and detailed design of electrical installations.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland