Airports · 2020–2022
Radom Airport — Ancillary Buildings
Buildings B1, B3 and K1 (7,600 m²): 15 kV/1.3 MW, 2×1250 kVA substation, 1,400 kVA generator set, 4×200 kVA UPS.

Project description
Scope and solutions
Reconstruction of Warsaw-Radom Airport — construction of ancillary buildings: B1, an office building for airport services with server rooms (3,552 m²); K1, an office building (818 m²); and B3, a garage and maintenance hall (3,227 m²), together with technical and road infrastructure and demolition of existing buildings. Detailed electrical design for general contractor ANNA-BUD (10.2020–01.2022): 15 kV supply with 1.3 MW capacity, 2×1250 kVA substation, 1,400 kVA generator set, 4×200 kVA and 40 kVA UPS, server room supply, BMS, HVAC, normal and emergency lighting, reactive power compensation, lightning protection and earthing. Reference from ANNA-BUD.
Reference letter — ANNA-BUD Sp. z o.o. (construction company)Ancillary buildings B1–B3 and K1, Warsaw-Radom Airport · 2022
Other projects

Extension of the Wrocław-Strachowice passenger terminal — electrical and ELV systems, design in progress.

VIP terminal at CPK Airport in Baranów (approx. 2,600 m²) — electrical and ELV design of the building (in progress).

New Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland