Airports · 2019
Radom Airport — Road Works Package
Road layout of the new Radom airport: MV and LV networks, transformer substations, lighting and ELV networks — detailed design for general contractor Drogomex.

Project description
Scope and solutions
The project covered the comprehensive design of power and telecommunications infrastructure for the road works package at Radom Airport. The scope included MV service connections, MV and LV power distribution networks, lighting and transformer substations. The design also covered a telecommunications service connection and a telecommunications network with a cable duct system. Internal electrical installations and ELV systems were also designed, ensuring full functionality and safety of the airport infrastructure in line with the highest technical standards.
Other projects

Extension of the Wrocław-Strachowice passenger terminal — electrical and ELV systems, design in progress.

VIP terminal at CPK Airport in Baranów (approx. 2,600 m²) — electrical and ELV design of the building (in progress).

New Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland