Airports · 2024–2025
Ryanair Maintenance Hangar, Berlin
Three-bay Ryanair hangar at Berlin airport (usable floor area 8,772 m²) with a staff and office section — tender design and detailed design.

Project description
Scope and solutions
Ryanair aircraft maintenance hangar at Berlin Airport (BER) — a three-bay hangar with a two-storey staff and office section, usable floor area 8,771.83 m²; design 2024–2025, construction 2025. Full multidisciplinary documentation by WLC Inżynierowie (tender design and detailed design); Eko Elprom — electrical and ELV systems to German standards (DIN/VDE): power supply and distribution, supply to aircraft servicing equipment, hangar and apron lighting, lightning protection and earthing, FAS/VAS, CCTV, access control, structured cabling. Visualisation: WLC Inżynierowie.
Other projects

Extension of the Wrocław-Strachowice passenger terminal — electrical and ELV systems, design in progress.

VIP terminal at CPK Airport in Baranów (approx. 2,600 m²) — electrical and ELV design of the building (in progress).

New Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland