Airports · 2024–2025
Ryanair Maintenance Hangar, Wrocław Airport
Ryanair MRO hangars in Wrocław (usable floor area 11,028 m²): single-bay and two-bay hangars with a staff and office section — building permit design and tender design.

Project description
Scope and solutions
Ryanair aircraft maintenance hangars at Wrocław Airport — usable floor area 11,028.04 m²: a single-bay and a two-bay hangar with a two-storey staff and office section between them; design 2024–2025, construction 2025. Full multidisciplinary documentation by WLC Inżynierowie (building permit design and tender design); Eko Elprom — electrical and ELV systems: supply from the airport network, transformer substation and power distribution, supply to aircraft servicing equipment (400 Hz/28 V DC outlets, overhead cranes, compressed air), lighting of the halls and apron, lightning protection and earthing in the explosion hazard zone, FAS and VAS, CCTV and access control, structured cabling. Visualisation: WLC Inżynierowie.
Other projects

Extension of the Wrocław-Strachowice passenger terminal — electrical and ELV systems, design in progress.

VIP terminal at CPK Airport in Baranów (approx. 2,600 m²) — electrical and ELV design of the building (in progress).

New Warsaw-Radom passenger terminal (30,000 m²): detailed design of electrical installations in 2D and 3D (Revit) for general contractor MIRBUD.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland