Infrastructure

Karsznica Multimodal Port

Karsznica transhipment terminal: power supply for gantry cranes and yards, transformer substations, site lighting, networks.

Karsznica Multimodal Port

Project description

Scope and solutions

The project covered the comprehensive design of the power infrastructure for the Karsznica Multimodal Port. The scope included MV service connections, MV and LV power distribution networks, the port lighting system and transformer substations. The work also included a telecom service connection design and reconstruction of the existing telecommunications network. In addition, internal electrical installations and ELV systems were designed, ensuring reliable operation of the port to the highest standards of performance and safety.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply with a quote and a schedule within one working day.

Quick enquiry

Quote within one working day. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland

    ELV department

    Telecommunications design

    HVAC automation & BMS