Power Supply for the TBM “Karpatka” — Babica Tunnel, S19 Rzeszów–Babica

MV power supply for the TBM boring the tunnel on the S19 — containerised substations, cable lines, coordination with the distribution system operator; for Mostostal Warszawa.

Power Supply for the TBM “Karpatka” — Babica Tunnel, S19 Rzeszów–Babica
Photo: GDDKiA

Project description

Scope and solutions

Power supply for the TBM “Karpatka” boring the twin-bore tunnel at Babica on the S19 expressway Rzeszów Południe–Babica — one of the largest tunnelling projects in Poland. The machine's very high power demand required the design of a temporary construction-site power system: service connection and MV/LV transformer substations, switchgear and cable routes to the tunnel portal. Designed for the general contractor Mostostal Warszawa, in cooperation with WLC Inżynierowie.

Contact

Planning a similar project?

Describe the building and the project stage — we will reply with a quote and a schedule within one working day.

Quick enquiry

Quote within one working day. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland

    ELV department

    Telecommunications design

    HVAC automation & BMS