Industrial
MAN Plant Extension, Niepołomice
Extension of the MAN Trucks bus factory — power distribution and ELV networks for a 10 MW plant (building permit design + detailed design), with WLC Inżynierowie.

Project description
Scope and solutions
Extension of the MAN Trucks plant in Niepołomice — building permit design and detailed design of power distribution and ELV networks for a plant with a contracted capacity of 10 MW: MV supply, transformer substations, LV site networks, site lighting, cable and telecommunications duct systems. Structural engineering and associated disciplines: WLC Inżynierowie.
Other projects

Detailed design of power networks for the extension of the Mercedes-Benz engine and battery plant (2022) — with WLC Inżynierowie and Elektrotim.

20,224 m² production and warehouse hall: 2.5 MVA MV service connection, 2×1600 kVA substation, 2,080 kW generator set.

Staco production hall: internal electrical and ELV installations, power distribution networks, transformer substation — for general contractor Łęgprzem.
Contact
Planning a similar project?
Describe the building and the project stage — we will reply with a quote and a schedule within one working day.
Talk to the designer
Address
ul. Myśliwska 66/123, 30-718 Kraków, Poland