Infrastructure · 2011

Zosin Border Crossing

Extension of a road border crossing — electrical, access control, CCTV, I&HAS, FAS, IT, networks and telecommunications.

Zosin Border Crossing

Project description

Scope and solutions

“Extension of the Zosin road border crossing” for the Lublin Border Crossings Authority in Chełm (Lubelski Zarząd Obsługi Przejść Granicznych) — designs of electrical installations, access control, CCTV, intruder and hold-up alarm system (I&HAS), fire alarm system (FAS) and IT, as well as power and telecommunications networks, with bills of quantities, client's cost estimates and specifications (01–08.2011), as a subcontractor to TOBIN Consulting Engineers. Reference from TOBIN (08.2012).

Reference letter: TOBIN Consulting EngineersReference letter — TOBIN Consulting EngineersExtension of the Zosin road border crossing · 2012

Contact

Planning a similar project?

Describe the building and the project stage — we will reply with a quote and a schedule within one working day.

Quick enquiry

Quote within one working day. Helpful: floor plans or the architectural design, the power balance, grid connection conditions (if any).

PDF, DWG, DXF, ZIP, JPG, PNG — up to 10 MB in total

    Talk to the designer

    Marek Łagodziński
    CEO · Lead Electrical Designer
    +48 604 152 533 · mlagodzinski@ekoelprom.pl

    Address

    EKO ELPROM Sp. z o.o.
    ul. Myśliwska 66/123, 30-718 Kraków, Poland

    ELV department

    Telecommunications design

    HVAC automation & BMS